Surrey · RH6
Demolition in Horley
Demolition is the controlled removal of a structure — from a single wall or outbuilding to a full building — including safety measures, waste removal and, where required, formal notice to the local authority before work starts.
In Horley, that covers Massetts, Lonsdale, Smallfield, Horley Row, Westvale Park. Horley sits close to Gatwick Airport, with a historic village core and substantial 20th-century residential development around it, making it a popular area for family homeowners looking to extend rather than move.
Coverage
Areas we cover in Horley for demolition
Property styles in Horley
The older village centre includes period cottages and Victorian houses, while the wider town has significant interwar and postwar estate housing well suited to standard rear extensions and loft conversions.
Planning considerations
Reigate & Banstead Borough Council is the local planning authority. Properties close to Gatwick Airport may be subject to airport safeguarding consultation requirements for certain types of development, which we check where relevant.
How it works
Our demolition process
- 01
Survey and notification
Assessing the structure, checking for asbestos, and notifying the local authority under the Building Act where required for larger demolitions.
- 02
Services disconnection
Disconnecting or capping gas, electricity, water and drainage connections ahead of demolition.
- 03
Demolition
Taking down the structure using appropriate methods for its size, materials and site access.
- 04
Waste clearance
Sorting and removing demolition waste and skips, and leaving the site made safe and clear.
Also in this area
Other services we provide in Horley
Nearby coverage
Demolition in nearby areas
Need help right now?
Before booking a site visit, get an instant answer for £4.99 — Ask an Expert in Horley.
FAQs
Demolition in Horley: FAQs
Do you provide demolition across all of Horley?
Yes, we cover the RH6 postcode area in full, including Massetts, Lonsdale, Smallfield, Horley Row, Westvale Park.
Do I need to notify the council before demolishing a building?
For larger demolitions, yes — a formal notice under Section 80 of the Building Act 1984 is usually required at least six weeks before work starts, giving the local authority the chance to set conditions covering matters like site safety, dust and adjoining structures. Smaller, non-notifiable demolitions still need to be carried out safely and in line with other regulations.
Do I need an asbestos survey before demolition?
If the building or any part of it was constructed before the 2000 UK asbestos ban, an asbestos survey is generally needed before demolition to identify and safely deal with any asbestos-containing materials, arranged with a specialist licensed contractor.
Does living near Gatwick Airport affect planning permission in Horley?
Some development types near the airport are subject to safeguarding consultation with the airport operator as part of the planning process. This does not apply to all projects, and we advise on the specific position for your address.
Get a quote for demolition in Horley
Tell us about the property and what you have in mind, and we'll arrange a site visit.
Last reviewed 2026-07-28.