Patio, driveway and hardstanding installation

Patios and Driveways

Patios and driveways covers designing and installing hard-standing surfaces — block paving, natural stone, resin-bound or tarmac — including sub-base preparation and drainage, which is a legal requirement for new impermeable driveways over a certain size.

Patios and Driveways

Definition

What patios & driveways involves

A patio or driveway installation involves excavating to the correct sub-base depth, laying a compacted sub-base, and installing the chosen surface material with appropriate falls for drainage. New or replacement driveways over 5 square metres using non-permeable materials require either planning permission or a permeable/soakaway drainage solution under permitted development rules.

Suitable for

  • New driveways or driveway replacement
  • Garden patios and outdoor entertaining areas
  • Resurfacing cracked or sunken existing hardstanding

Not suitable for

  • Driveways over 5 square metres using non-permeable materials without a drainage solution — this needs either planning permission or a permitted-development-compliant drainage design, which we advise on

Process

How the work is carried out

  1. 01

    Design

    Agreeing layout, material and falls for drainage.

  2. 02

    Excavation

    Excavating to the correct depth for the chosen sub-base and surface.

  3. 03

    Sub-base

    Laying and compacting a sub-base appropriate to the surface and expected loading.

  4. 04

    Surface installation

    Laying block paving, stone, resin or tarmac to the agreed design.

  5. 05

    Drainage and finishing

    Installing drainage where required, jointing and finishing edges.

Typical timescale

A standard driveway typically takes three to seven days depending on size and material; patios are often quicker, confirmed after a site visit.

Cost guidance

Cost depends on area, chosen material and sub-base requirements. An itemised quotation follows a site visit and design discussion.

Limitations and exclusions

  • Planning permission requirements for non-permeable driveways over 5 square metres are checked and advised on before work starts
  • Existing utility covers and access points are worked around and may affect layout options

FAQs

Patios & Driveways FAQs

Do I need planning permission for a new driveway?

If the new or replacement driveway is more than 5 square metres and uses a non-permeable material without a soakaway or permeable drainage solution, planning permission is normally required. Using permeable materials or directing rainwater to a lawn or border avoids this. We advise on the right approach for your property.

Discuss your patios & driveways project

Tell us about the property and what you have in mind, and we'll arrange a site visit.

Last reviewed 2026-07-19.