Kitchen design and installation, from layout to finished fit-out

Kitchen Installation

Kitchen installation covers layout planning, first-fix plumbing and electrical work, cabinetry and worktop fitting, and finishes such as splashbacks and flooring, coordinated as a single project rather than separate trades.

Kitchen Installation

Definition

What kitchens involves

A kitchen installation ranges from a like-for-like cabinet swap to a full reconfiguration involving new plumbing and electrical runs, structural changes for open-plan layouts, and integration with an extension. It draws together plumbing, electrical, plastering, tiling and carpentry trades under one programme.

Suitable for

  • Full kitchen refits and reconfigurations
  • Kitchens as part of a wider extension or open-plan renovation
  • Layout changes involving moving plumbing or electrical points
  • Supply-and-fit or fit-only, depending on where you're sourcing units

Not suitable for

  • Minor cosmetic changes such as door replacement alone, where a full refit isn't needed — we can advise if a lighter-touch approach suits your budget

Process

How the work is carried out

  1. 01

    Design

    Agreeing layout, appliance positions and services requirements, including any structural changes.

  2. 02

    Strip-out

    Removing existing units, and any structural or services work opened up ahead of first fix.

  3. 03

    First fix

    Plumbing and electrical containment run to new appliance and socket positions.

  4. 04

    Plastering and flooring

    Making good walls and installing flooring ahead of cabinetry.

  5. 05

    Installation

    Fitting cabinetry, worktops, appliances and splashbacks.

  6. 06

    Completion

    Testing plumbing and electrical connections, and final snagging.

Typical timescale

A straightforward kitchen refit typically takes two to three weeks on site; layout changes or integration with a wider extension take longer, confirmed once the design is fixed.

Cost guidance

Cost depends heavily on the chosen units, worktop material, appliances and the extent of layout change. An itemised quotation follows the design stage rather than a fixed headline price.

Limitations and exclusions

  • Units, worktops and appliances are supplied to your specification; we can advise on suppliers but final choice and cost sits with you unless a supply-and-fit package is agreed
  • Structural alterations for open-plan layouts require engineering input, arranged as part of the wider project
  • Gas appliance connections are carried out only by Gas Safe registered engineers

FAQs

Kitchens FAQs

Can you fit a kitchen I've bought elsewhere?

Yes, fit-only installation is common — we coordinate plumbing, electrics and carpentry around units and appliances you've sourced yourself.

How long does a kitchen installation take?

A straightforward refit typically takes two to three weeks; layout changes involving moved plumbing or structural work extend this. We confirm a realistic programme once the design is agreed.

Can you remove a wall between the kitchen and dining room?

Often, yes, subject to whether it's load-bearing. That needs a structural engineer's design for a beam or lintel and, in most cases, Building Regulations sign-off, which we arrange as part of the wider project rather than treating it as a separate job.

Do you disconnect and reconnect the gas cooker or hob?

Disconnection and reconnection of gas appliances is carried out only by our Gas Safe registered engineers, who issue the relevant certification. This is scheduled alongside the rest of the installation, not left for you to arrange separately.

Discuss your kitchens project

Tell us about the property and what you have in mind, and we'll arrange a site visit.

Last reviewed 2026-07-19.

Request a Quote

We use Google Analytics to understand how visitors use this site. Nothing is tracked until you accept. Cookie Policy